Installation, integration and maintenance support for agitated thin-film dryers.

Scope-led delivery

Practical execution. Clearly defined responsibility.

Our scope covers ATFD equipment installation, feed and vapour piping, condenser integration, supports, maintenance and component replacement.

The plant context

The industrial challenge

The final concentration stage must connect with upstream concentrate transfer, vapour handling and downstream solids collection without compromising maintenance access.

How it fits into the plant

An agitated thin-film dryer spreads material over a heated surface while a rotor agitates it. Selected applications use this stage to dry concentrate; suitability depends on feed behaviour and supplier design.

Our execution scope

  • Equipment installation
  • Feed and vapour piping
  • Condenser integration
  • Support structures
  • Rotating-equipment installation support
  • Maintenance and component replacement

The final scope, specifications and responsibilities are agreed for each project.

Typical equipment & activities

  • ATFD package
  • Feed system
  • Condenser connections
  • Discharge and collection interfaces

Execution approach

  1. 01

    Review the site, approved drawings and package interfaces.

  2. 02

    Agree the BOQ, execution sequence, access and inspection hold points.

  3. 03

    Coordinate fabrication, installation and testing with the plant team.

  4. 04

    Close the punch list and submit the agreed handover records.

Where this capability fits

  • ZLD concentrate handling
  • Thermal drying integration
  • Existing dryer revamps
Explore industry applications

Quality & HSE considerations

Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.

  • Material and equipment identification against the approved scope
  • Applicable inspection and test records
  • Site permit, isolation and access coordination
  • Documented checks and punch-list closure
Our quality & safety approach

Common questions

What information is needed to define the scope?

Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.

Can this work be integrated with a planned shutdown?

The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.

Start a conversation

Have a plant challenge?

Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.