Industrial Water Projects
RO System Installation & Integration
Mechanical execution for reverse-osmosis systems and connected recovery equipment.
Scope-led delivery
Practical execution. Clearly defined responsibility.
We coordinate RO skid installation, piping, pump interfaces, supports and modifications with the appointed technology supplier and plant team.
The plant context
The industrial challenge
Recovery systems can be constrained by package tie-ins, reject handling, maintenance access and the readiness of upstream treatment.
How it fits into the plant
RO produces a permeate stream and a more concentrated reject stream. Both destinations must be considered alongside pretreatment and the supplier's operating envelope.
Our execution scope
- RO package installation
- Feed, permeate and reject piping
- Pump and support installation
- Cleaning-package interfaces
- Brownfield integration
- Mechanical-completion support
The final scope, specifications and responsibilities are agreed for each project.
Typical equipment & activities
- RO skids
- High-pressure pump interfaces
- Permeate and reject tanks
- Cleaning-system connections
Execution approach
- 01
Review the site, approved drawings and package interfaces.
- 02
Agree the BOQ, execution sequence, access and inspection hold points.
- 03
Coordinate fabrication, installation and testing with the plant team.
- 04
Close the punch list and submit the agreed handover records.
Where this capability fits
- Industrial water reuse
- Process and utility water
- ZLD pretreatment trains
Quality & HSE considerations
Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.
- Material and equipment identification against the approved scope
- Applicable inspection and test records
- Site permit, isolation and access coordination
- Documented checks and punch-list closure
Common questions
What information is needed to define the scope?
Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.
Can this work be integrated with a planned shutdown?
The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.
Connected capabilities
The work around the system.
UF Systems
Mechanical installation and piping support for ultrafiltration packages.
Explore capabilityMEE Systems
Mechanical erection, piping, installation, revamps and maintenance for multiple-effect evaporator systems.
Explore capabilityZLD Integration
Coordinated mechanical execution across effluent treatment, membrane recovery and thermal concentration.
Explore capabilityEffluent Recycling
Execution support for projects that return suitably treated water to industrial use.
Explore capabilityStart a conversation
Have a plant challenge?
Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.