Mechanical Projects
Brownfield Plant Modifications
Mechanical execution planned around existing plant layouts and operating constraints.
Scope-led delivery
Practical execution. Clearly defined responsibility.
We coordinate piping changes, equipment installation, structural modifications and approved tie-ins within existing industrial environments.
The plant context
The industrial challenge
Brownfield sites rarely offer an empty working area. Existing services, restricted access and concurrent operations shape every execution decision.
How it fits into the plant
Modification work links an approved engineering change with installation, inspection and a controlled handover back to the plant team.
Our execution scope
- Site measurement and interface review
- Piping rerouting and replacement
- Equipment additions
- Support and platform changes
- Planned tie-ins
- Shutdown execution support
The final scope, specifications and responsibilities are agreed for each project.
Typical equipment & activities
- Existing process equipment
- Interconnecting pipework
- Utility networks
- Support and access structures
Execution approach
- 01
Review the site, approved drawings and package interfaces.
- 02
Agree the BOQ, execution sequence, access and inspection hold points.
- 03
Coordinate fabrication, installation and testing with the plant team.
- 04
Close the punch list and submit the agreed handover records.
Where this capability fits
- Capacity improvement projects
- Equipment upgrades
- Plant-layout changes
Quality & HSE considerations
Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.
- Material and equipment identification against the approved scope
- Applicable inspection and test records
- Site permit, isolation and access coordination
- Documented checks and punch-list closure
Common questions
What information is needed to define the scope?
Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.
Can this work be integrated with a planned shutdown?
The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.
Connected capabilities
The work around the system.
Plant Revamps
Improve ageing industrial systems through structured inspection, modification and shutdown execution.
Explore capabilityShutdown & Turnaround
Coordinated mechanical work for planned plant shutdowns and turnarounds.
Explore capabilityIndustrial Piping
Process and utility piping, from fabrication and erection to testing support and modification.
Explore capabilityStart a conversation
Have a plant challenge?
Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.