Mechanical Projects

Equipment Erection & Mechanical Installation

Site coordination and erection support for process equipment and plant packages.

Scope-led delivery

Practical execution. Clearly defined responsibility.

We coordinate the mechanical installation sequence around equipment readiness, approved lifting arrangements, access and supplier requirements.

The plant context

The industrial challenge

Large equipment installation often depends on several activities being ready together: foundations, crane access, surrounding structures and connected piping.

How it fits into the plant

Erection places equipment into the plant layout and prepares it for mechanical connections, inspection and commissioning support.

Our execution scope

  • Equipment installation planning
  • Mechanical erection
  • Positioning and alignment support
  • Package interface coordination
  • Connected piping and supports
  • Punch-list closure

The final scope, specifications and responsibilities are agreed for each project.

Typical equipment & activities

  • Process vessels
  • Heat exchangers
  • Tanks
  • Pumps
  • Packaged skids

Execution approach

  1. 01

    Review the site, approved drawings and package interfaces.

  2. 02

    Agree the BOQ, execution sequence, access and inspection hold points.

  3. 03

    Coordinate fabrication, installation and testing with the plant team.

  4. 04

    Close the punch list and submit the agreed handover records.

Where this capability fits

  • Water-treatment installations
  • Mechanical project execution
  • Equipment replacement
Explore industry applications

Quality & HSE considerations

Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.

  • Material and equipment identification against the approved scope
  • Applicable inspection and test records
  • Site permit, isolation and access coordination
  • Documented checks and punch-list closure
Our quality & safety approach

Common questions

What information is needed to define the scope?

Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.

Can this work be integrated with a planned shutdown?

The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.

Start a conversation

Have a plant challenge?

Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.