Shutdown & Turnaround Execution

Coordinated mechanical work for planned plant shutdowns and turnarounds.

Scope-led delivery

Practical execution. Clearly defined responsibility.

We prepare and execute agreed piping, equipment replacement, installation and maintenance work within the plant's shutdown programme.

The plant context

The industrial challenge

A short shutdown window leaves little room for missing materials, unresolved interfaces or inspection activities that were not planned.

How it fits into the plant

Shutdown execution links the pre-shutdown preparation, permit and isolation arrangements, physical work and documented handover to operations.

Our execution scope

  • Work-pack and sequence coordination
  • Pre-shutdown fabrication
  • Piping replacement and tie-ins
  • Equipment replacement
  • Maintenance execution
  • Inspection and closeout support

The final scope, specifications and responsibilities are agreed for each project.

Typical equipment & activities

  • Piping systems
  • Pumps and heat exchangers
  • Evaporation equipment
  • Supporting structures

Execution approach

  1. 01

    Review equipment history, the reported issue and available inspection records.

  2. 02

    Agree the intervention, spares, isolation responsibilities and work window.

  3. 03

    Execute approved work in coordination with plant operations.

  4. 04

    Record completed work, outstanding observations and handover requirements.

Where this capability fits

  • Planned annual shutdowns
  • Brownfield modifications
  • Maintenance turnarounds
Explore industry applications

Quality & HSE considerations

Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.

  • Material and equipment identification against the approved scope
  • Applicable inspection and test records
  • Site permit, isolation and access coordination
  • Documented checks and punch-list closure
Our quality & safety approach

Common questions

What information is needed to define the scope?

Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.

Can this work be integrated with a planned shutdown?

The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.

Start a conversation

Have a plant challenge?

Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.