Industrial Water Projects
MVR / MVRE System Project Support
Package installation and mechanical integration support for mechanical vapour recompression systems.
Scope-led delivery
Practical execution. Clearly defined responsibility.
We support MVR projects through package installation, equipment erection, vapour and condensate piping, structural supports and integration modifications.
The plant context
The industrial challenge
MVR integration changes equipment layouts, utility interfaces and maintenance requirements. Retrofitting an existing plant requires coordination across the process, mechanical and electrical disciplines.
How it fits into the plant
Mechanical vapour recompression raises the pressure and temperature of process vapour so it can be reused as a heating medium. Suitability and energy performance depend on the actual process and equipment design.
Our execution scope
- MVR package installation
- Compressor-area mechanical works
- Vapour and condensate piping
- Equipment erection and supports
- MEE-to-MVR retrofit execution
- Maintenance support
The final scope, specifications and responsibilities are agreed for each project.
Typical equipment & activities
- Vapour recompression package interfaces
- Evaporator and separator connections
- Condensate systems
- Access and support structures
Execution approach
- 01
Review the site, approved drawings and package interfaces.
- 02
Agree the BOQ, execution sequence, access and inspection hold points.
- 03
Coordinate fabrication, installation and testing with the plant team.
- 04
Close the punch list and submit the agreed handover records.
Where this capability fits
- Industrial evaporation projects
- Approved MEE-to-MVR conversions
- Thermal-system upgrades
Quality & HSE considerations
Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.
- Material and equipment identification against the approved scope
- Applicable inspection and test records
- Site permit, isolation and access coordination
- Documented checks and punch-list closure
Common questions
What information is needed to define the scope?
Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.
Can this work be integrated with a planned shutdown?
The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.
Connected capabilities
The work around the system.
MEE Systems
Mechanical erection, piping, installation, revamps and maintenance for multiple-effect evaporator systems.
Explore capabilityMEE-to-MVR Retrofit
Mechanical execution for approved evaporation-system conversions and recompression integration.
Explore capabilityCondensate Recovery
Collection, transfer and mechanical integration for condensate-recovery projects.
Explore capabilityStart a conversation
Have a plant challenge?
Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.