
Industrial Water Projects
Effluent Recycling & Water Recovery
Execution support for projects that return suitably treated water to industrial use.
Scope-led delivery
Practical execution. Clearly defined responsibility.
Water recovery depends on an agreed treatment scheme and complete mechanical interfaces. We install and connect treatment packages, transfer systems, reuse piping and associated structures.
The plant context
The industrial challenge
A recovery project must account for existing wastewater streams, available space, reuse-water destinations and residual-stream handling.
How it fits into the plant
Recycling can link an existing ETP with membrane treatment and, where required, thermal concentration. Reuse suitability must be established against the receiving process's water-quality needs.
Our execution scope
- Recovery-package installation
- Feed and reuse-water piping
- Reject-line integration
- Storage and transfer modifications
- Supporting structures
- Commissioning support
The final scope, specifications and responsibilities are agreed for each project.
Typical equipment & activities
- Transfer pumps
- UF / RO skids
- Collection tanks
- Reuse-water distribution lines
Execution approach
- 01
Review the site, approved drawings and package interfaces.
- 02
Agree the BOQ, execution sequence, access and inspection hold points.
- 03
Coordinate fabrication, installation and testing with the plant team.
- 04
Close the punch list and submit the agreed handover records.
Where this capability fits
- Industrial reuse networks
- ETP upgrades
- Water-recovery integration
Quality & HSE considerations
Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.
- Material and equipment identification against the approved scope
- Applicable inspection and test records
- Site permit, isolation and access coordination
- Documented checks and punch-list closure
Common questions
What information is needed to define the scope?
Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.
Can this work be integrated with a planned shutdown?
The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.
Connected capabilities
The work around the system.
ETP & Recycling
Mechanical execution, equipment installation and integration for industrial effluent-treatment plants.
Explore capabilityRO Systems
Mechanical execution for reverse-osmosis systems and connected recovery equipment.
Explore capabilityCondensate Recovery
Collection, transfer and mechanical integration for condensate-recovery projects.
Explore capabilityZLD Integration
Coordinated mechanical execution across effluent treatment, membrane recovery and thermal concentration.
Explore capabilityStart a conversation
Have a plant challenge?
Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.
