Stripper System Project Execution

Mechanical installation, piping and revamp support for industrial stripper systems.

Scope-led delivery

Practical execution. Clearly defined responsibility.

We coordinate column installation, feed and utility piping, condenser connections, reboiler integration, platforms and instrumentation interfaces under an approved process scope.

The plant context

The industrial challenge

Adding or modifying a stripping stage creates closely connected column, utility, vapour-handling and downstream-treatment requirements.

How it fits into the plant

Stripping can transfer suitable volatile contaminants from a liquid into a vapour or gas stream. The selected process must also address that overhead stream and the characteristics of the wastewater.

Our execution scope

  • Column installation
  • Feed piping
  • Steam and utility piping
  • Condenser and reboiler interfaces
  • Platforms and instrumentation coordination
  • Revamp and maintenance

The final scope, specifications and responsibilities are agreed for each project.

Typical equipment & activities

  • Stripper column
  • Reboiler interfaces
  • Condenser
  • Transfer pumps and piping

Execution approach

  1. 01

    Review the site, approved drawings and package interfaces.

  2. 02

    Agree the BOQ, execution sequence, access and inspection hold points.

  3. 03

    Coordinate fabrication, installation and testing with the plant team.

  4. 04

    Close the punch list and submit the agreed handover records.

Where this capability fits

  • Approved industrial effluent-treatment schemes
  • Treatment-plant modifications
  • Existing column maintenance
Explore industry applications

Quality & HSE considerations

Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.

  • Material and equipment identification against the approved scope
  • Applicable inspection and test records
  • Site permit, isolation and access coordination
  • Documented checks and punch-list closure
Our quality & safety approach

Common questions

What information is needed to define the scope?

Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.

Can this work be integrated with a planned shutdown?

The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.

Start a conversation

Have a plant challenge?

Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.