DAHARI INDUSTRIES

Lifecycle Services

Industrial Equipment Replacement

Planned removal, replacement and integration of mechanical plant equipment.

Scope-led delivery

Practical execution. Clearly defined responsibility.

We coordinate replacement work around the equipment's dimensions, service connections, removal routes and the time available for installation and inspection.

The plant context

The industrial challenge

Like-for-like intent does not always produce like-for-like interfaces. Updated equipment can change pipework, supports and access requirements.

How it fits into the plant

Replacement work restores or changes an asset within the approved engineering scope and the plant's maintenance programme.

Our execution scope

  • Removal and installation planning
  • Pump replacement
  • Heat-exchanger replacement
  • Piping replacement
  • Support modifications
  • Testing and handover support

The final scope, specifications and responsibilities are agreed for each project.

Typical equipment & activities

  • Pumps
  • Heat exchangers
  • Process vessels
  • Pipework and approved components

Execution approach

  1. 01

    Review equipment history, the reported issue and available inspection records.

  2. 02

    Agree the intervention, spares, isolation responsibilities and work window.

  3. 03

    Execute approved work in coordination with plant operations.

  4. 04

    Record completed work, outstanding observations and handover requirements.

Where this capability fits

  • Scheduled maintenance
  • Revamp projects
  • Shutdown replacement campaigns
Explore industry applications

Quality & HSE considerations

Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.

  • Material and equipment identification against the approved scope
  • Applicable inspection and test records
  • Site permit, isolation and access coordination
  • Documented checks and punch-list closure
Our quality & safety approach

Common questions

What information is needed to define the scope?

Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.

Can this work be integrated with a planned shutdown?

The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.