Industrial Water Projects
UF System Installation & Integration
Mechanical installation and piping support for ultrafiltration packages.
Scope-led delivery
Practical execution. Clearly defined responsibility.
We support UF package installation, feed and filtrate connections, backwash interfaces, platforms and modifications. Work follows the equipment supplier's approved requirements.
The plant context
The industrial challenge
Membrane packages need coordinated connections and sufficient access for service, inspection and replacement.
How it fits into the plant
Ultrafiltration separates suspended particles from water and may form part of pretreatment for RO. It does not replace the feed assessment or the treatment required for dissolved contaminants.
Our execution scope
- Skid positioning and installation
- Feed and filtrate piping
- Backwash and drain integration
- Pump installation
- Maintenance-access coordination
- Testing support
The final scope, specifications and responsibilities are agreed for each project.
Typical equipment & activities
- UF modules and skids
- Feed and backwash pumps
- Piping and supports
- Package utility interfaces
Execution approach
- 01
Review the site, approved drawings and package interfaces.
- 02
Agree the BOQ, execution sequence, access and inspection hold points.
- 03
Coordinate fabrication, installation and testing with the plant team.
- 04
Close the punch list and submit the agreed handover records.
Where this capability fits
- RO pretreatment
- Tertiary-treatment integration
- Industrial reuse projects
Quality & HSE considerations
Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.
- Material and equipment identification against the approved scope
- Applicable inspection and test records
- Site permit, isolation and access coordination
- Documented checks and punch-list closure
Common questions
What information is needed to define the scope?
Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.
Can this work be integrated with a planned shutdown?
The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.
Connected capabilities
The work around the system.
RO Systems
Mechanical execution for reverse-osmosis systems and connected recovery equipment.
Explore capabilityETP & Recycling
Mechanical execution, equipment installation and integration for industrial effluent-treatment plants.
Explore capabilityEffluent Recycling
Execution support for projects that return suitably treated water to industrial use.
Explore capabilityStart a conversation
Have a plant challenge?
Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.