Industrial Water Projects
Industrial Water Plant Revamps & Upgrades
Mechanical modifications and execution support for existing treatment and recovery plants.
Scope-led delivery
Practical execution. Clearly defined responsibility.
We support approved water-plant improvements with replacement equipment, piping modifications, installation works and shutdown coordination.
The plant context
The industrial challenge
Ageing equipment, access limitations and changed duties can make a once-suitable layout difficult to maintain or expand.
How it fits into the plant
A revamp connects the process improvement plan with the physical work required on site. Diagnosis, design approval and agreed acceptance criteria come before execution.
Our execution scope
- Site-condition review
- Equipment replacement
- Piping modification
- Support and platform changes
- Package integration
- Shutdown and restart support
The final scope, specifications and responsibilities are agreed for each project.
Typical equipment & activities
- Treatment skids
- Pumps and heat exchangers
- Evaporation equipment
- Transfer piping
Execution approach
- 01
Review the site, approved drawings and package interfaces.
- 02
Agree the BOQ, execution sequence, access and inspection hold points.
- 03
Coordinate fabrication, installation and testing with the plant team.
- 04
Close the punch list and submit the agreed handover records.
Where this capability fits
- ETP and reuse upgrades
- MEE modifications
- Recovery-system expansion
Quality & HSE considerations
Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.
- Material and equipment identification against the approved scope
- Applicable inspection and test records
- Site permit, isolation and access coordination
- Documented checks and punch-list closure
Common questions
What information is needed to define the scope?
Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.
Can this work be integrated with a planned shutdown?
The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.
Connected capabilities
The work around the system.
Plant Revamps
Improve ageing industrial systems through structured inspection, modification and shutdown execution.
Explore capabilityMEE-to-MVR Retrofit
Mechanical execution for approved evaporation-system conversions and recompression integration.
Explore capabilityEquipment Replacement
Planned removal, replacement and integration of mechanical plant equipment.
Explore capabilityStart a conversation
Have a plant challenge?
Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.