Lifecycle Services
Corrective Maintenance
Planned mechanical intervention to address identified equipment and piping defects.
Scope-led delivery
Practical execution. Clearly defined responsibility.
We support repair and replacement work after the issue, technical scope and acceptance requirements have been assessed with the plant team.
The plant context
The industrial challenge
An observed defect needs a defined response that accounts for its cause, the approved repair method and any connected equipment.
How it fits into the plant
Corrective work follows inspection or a reported fault and feeds back into the site's maintenance record and future plans.
Our execution scope
- Site-condition review
- Approved repair execution
- Component replacement
- Piping modification
- Inspection and testing support
- Completion records
The final scope, specifications and responsibilities are agreed for each project.
Typical equipment & activities
- Mechanical equipment
- Pumps
- Process pipework
- Supports and access structures
Execution approach
- 01
Review equipment history, the reported issue and available inspection records.
- 02
Agree the intervention, spares, isolation responsibilities and work window.
- 03
Execute approved work in coordination with plant operations.
- 04
Record completed work, outstanding observations and handover requirements.
Where this capability fits
- Identified maintenance defects
- Inspection follow-up
- Planned repair campaigns
Quality & HSE considerations
Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.
- Material and equipment identification against the approved scope
- Applicable inspection and test records
- Site permit, isolation and access coordination
- Documented checks and punch-list closure
Common questions
What information is needed to define the scope?
Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.
Can this work be integrated with a planned shutdown?
The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.
Connected capabilities
The work around the system.
AMC
An agreed maintenance scope built around the equipment, plant priorities and operating schedule.
Explore capabilityEquipment Replacement
Planned removal, replacement and integration of mechanical plant equipment.
Explore capabilityBreakdown Support
Mechanical support for reported plant issues, with scope and attendance agreed after review.
Explore capabilityStart a conversation
Have a plant challenge?
Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.