Mechanical Projects

Skids & Modular Package Installation

Mechanical assembly and installation support for industrial skids and package systems.

Scope-led delivery

Practical execution. Clearly defined responsibility.

We support package installation, connected piping, support frames and site interfaces so that modular equipment can be integrated into the wider plant.

The plant context

The industrial challenge

A skid's compact footprint does not remove the need to coordinate utilities, drainage, lifting, inspection and replacement access.

How it fits into the plant

Skids bring equipment together as a package. The project still needs clear responsibilities at every connection between the package and the site.

Our execution scope

  • Skid positioning and installation
  • Approved mechanical assembly
  • Interconnecting piping
  • Support structures
  • Utility tie-ins
  • Mechanical-completion checks

The final scope, specifications and responsibilities are agreed for each project.

Typical equipment & activities

  • Pump skids
  • Water-treatment packages
  • Mechanical modules
  • Package support frames

Execution approach

  1. 01

    Review the site, approved drawings and package interfaces.

  2. 02

    Agree the BOQ, execution sequence, access and inspection hold points.

  3. 03

    Coordinate fabrication, installation and testing with the plant team.

  4. 04

    Close the punch list and submit the agreed handover records.

Where this capability fits

  • Industrial water systems
  • Plant upgrades
  • New package integration
Explore industry applications

Quality & HSE considerations

Inspection and site controls are coordinated with the approved work scope, plant requirements and equipment supplier instructions.

  • Material and equipment identification against the approved scope
  • Applicable inspection and test records
  • Site permit, isolation and access coordination
  • Documented checks and punch-list closure
Our quality & safety approach

Common questions

What information is needed to define the scope?

Please share the plant location, current arrangement, required work, available drawings and target schedule. A site review establishes interfaces, access and the responsibilities of each party.

Can this work be integrated with a planned shutdown?

The execution sequence can be coordinated with an agreed shutdown window. Material readiness, approved drawings, isolation arrangements and inspection requirements need to be resolved before mobilisation.

Start a conversation

Have a plant challenge?

Whether you are planning a new installation, brownfield modification, shutdown or system upgrade, start with a conversation about the plant.